Site documentation, progress capture, and as-built reference — captured by your own team, on weekly rental terms.
Construction documentation has a timing problem: by the time a survey is commissioned, scheduled, and delivered, the site has moved on. Disputes, coordination clashes, and as-built gaps grow in that lag — and most of them would have been settled by a spatial record captured at the right moment.
A rented Lixel K2 puts capture on the project’s schedule instead. A site engineer walks the floor at each milestone; twenty minutes later there is a permanent, measurable record of exactly what was built, when.
Milestone walks become versioned spatial records — evidence for claims, handovers, and coordination.
Point clouds your BIM team models against, or verifies design intent with.
Clash-prone areas captured before they close up — services, ceilings, risers.
Most construction renters settle into a rhythm: rent for a week around each milestone, walk the site systematically, process in LixelStudio, and archive exports alongside project records. The dataset stays with the project — usable in disputes, handover packs, and future renovation work.
About Scan-to-BIM referenceShare your rental dates, site, and intended workflow. We respond with availability, terms, and a quote — or an honest no if rental is not the right fit.
Request rental availability