Site documentation, progress capture, and as-built reference, captured by your own team, on weekly rental terms.
Construction documentation has a timing problem: by the time a survey is commissioned, scheduled, and delivered, the site has moved on. Disputes, coordination clashes, and as-built gaps grow in that lag, and most of them would have been settled by a spatial record captured at the right moment.
A rented Lixel K2 puts capture on the project’s schedule instead. A site engineer walks the floor at each milestone; twenty minutes later there is a permanent, measurable record of exactly what was built, when.
Milestone walks become versioned spatial records: evidence for claims, handovers, and coordination.
Point clouds your BIM team models against, or verifies design intent with.
Clash-prone areas captured before they close up: services, ceilings, risers.
Most construction renters settle into a rhythm: rent for a week around each milestone, walk the site systematically, process in LixelStudio, and archive exports alongside project records. The dataset stays with the project, usable in disputes, handover packs, and future renovation work.
About Scan-to-BIM referenceShare your rental dates, site, and intended workflow. We respond with availability, terms, and a quote, or an honest no if rental is not the right fit.
Request rental availability